Deliverables of this Smooth Start Upgrade Offering
Task 1 - Conduct an on-site survey.
The objective of this task is to identify and document the existing Kofax Ascent Capture installation and system architecture.
Task 2 - Document specific upgrade process.
The objective of this task is to analyse the site survey report, identify and document in the form of a 'Scope of Work' the most appropriate Kofax Ascent Capture Upgrade process taking into account the batch classes and system constraints.
Task 3 - Backup existing Kofax Ascent Capture system.
The objective of this task is to backup the existing Kofax Ascent Capture system including batch class definitions and the Ascent Capture database.
Task 4 - Upgrade Kofax Ascent Capture server / standalone system.
The objective of this task is to upgrade one (1) existing Kofax Ascent Capture server or standalone system to version 6.
Task 5 - Upgrade Kofax Ascent Capture Client
The purpose of this task is to upgrade a single Kofax Ascent Capture Client.
Task 6 - Perform post upgrade testing.
The objective of this task is to verify that a successful upgrade has been achieved and image capture can re-commence.
|